Medon S.A.

MEDON S.A. was established in June 2007 having as main scope to develop and manage P/V park in THESPROTIA (Land Area about 43.900m2, capacity 1,999 MWp/h)

  • Its construction started in June 2012 with high-end Photovoltaic Panels and Electricity Management Systems.
  • At the beginning of 2013, construction and trial operation were finalized and the park was connected to the main grid of Public Power Corporation.
  • PV park design and installation was certified by TUV NORD (Certificate Nr TUV H.14/8311)

 

More info can be found on www.medon.gr >